Source and system landscape
An inventory of sources, interfaces, dependencies, owners and target systems.
Data flows between ERP, PIM and e-commerce, with mapping, tests, cutover and rollback.
When it becomes a risk
The risk starts where different data models, undocumented rules and system dependencies meet on one go-live date. We put this process in order before the first production transfer.
Our integration work in numbers
Figures from our own projects and the Pimcore partner directory.
Sources: LemonMind, November 2026 · Pimcore partner directory, 4 Nov 2026
Where the data flows
ERP, suppliers and the old system feed the PIM. The PIM publishes to the shop, and the ERP loop keeps prices, stock and orders in sync.
Sources
item codes, prices, stock
files and feeds, in batches
data moved once, then retired
batch, files and APIs
Product data
one data model with mapping rules and checks
API
Sales
catalogue, cart and orders
prices and stock by API, orders back as events
published to
Channels
orders back as events
prices and stock by API
Compare
Most landscapes mix patterns: batch for bulk data, APIs for what must be current, events for changes that trigger work elsewhere.
| Criterion | Batch ETL or files | Real-time API | Events and webhooks |
|---|---|---|---|
| Best for | Bulk loads, migrations, nightly catalogue updates | Prices, stock and data a user needs right now | Changes that start a process in another system |
| Freshness | Minutes to hours | Seconds | Near real time, after each change |
| Typical use | Initial migration, supplier files, feeds | Shop asks ERP for stock; PIM publishes a product | Order placed, product approved, price changed |
| Watch out for | Stale data between runs | Load on source systems, timeouts | Ordering, retries and duplicates |
Comparison prepared by LemonMind, October 2026.
We map your systems and data flows and show what to move once and what to keep in sync.
Scope
An inventory of sources, interfaces, dependencies, owners and target systems.
Objects, attributes, relations, units, dictionaries and classifications matched, with rules for gaps and conflicts.
Flows using APIs, files, batch processing or events, chosen per data type.
Controlled extraction, transformation and loading with error handling and the option to repeat.
Quality rules, source-to-target comparison, difference reports and acceptance criteria.
A launch plan, monitoring, exception handling, rollback and control of the first production cycles.
How we work
Sources, target systems, dependencies, data scope and continuity requirements.
Flows, data contracts, transformations and how gaps and conflicts are handled.
A repeatable pipeline, tested scenarios and source-to-target comparison.
A controlled launch, monitored flows and exceptions handled by agreed rules.
Case studies

Pimcore as the foundation for product data management and a composable commerce architecture.
Read case study
A central Pimcore system extended with ETIM classification, BMEcat export and the ETIM Mapper tool.
Read case study
A new website for Polish Baltic Shipping Co., with a redesigned booking path, a CMS integrated with booking systems and a timetable module.
Read case study
A new corporate website for one of the largest Polish online pharmacies, built on Pimcore and integrated with an external recruitment system.
Read case studyNo. A migration moves data once, from an old system to a new one. An integration keeps data flowing between systems every day. Most projects need both. See also how to centralise distributed product data.
ERP, PIM, DAM, CRM, e-commerce platforms, marketplaces and supplier sources, through APIs, files, batch processing or events. Example: PIM to VTEX integration.
Mapping rules, validation and reconciliation reports compare source and target before go-live, with acceptance criteria agreed up front.
Usually not for long. A test migration, a planned cutover window and a rollback plan keep the downtime short and predictable.
The cutover plan defines the point of no return and how to return to the old system if acceptance criteria are not met.
Yes. Starting with one flow or one data domain shows the effort and risks for the rest.


Start with a risk map
A short readiness assessment defines dependencies, risks, acceptance criteria and the order of work before any production data moves.
30 minutes. The calendar opens in a new tab.