Skip to content
openProd

openProd imports supplier PDFs and spreadsheets into your PIM.

See openProd live.

Book a demo (opens in a new tab)
Book a free review
Pimcore Platinum Partner

Support for your Pimcore version is ending. What next?

Community support for each Pimcore version ends when the next one is released. Find out in 60 minutes what that means for your installation.

The call is held in English. You do not need to prepare anything.

Pimcore Platinum Partner, one of two in Poland. Since 2010, 48 Pimcore clients (pimcore.com directory).

Book a free review

We reply personally within 1 business day.

The data controller is Lemonmind sp. z o.o., Azymutalna 9, 80‑298 Gdańsk. We use the data from this form to reply to your request. Details and your rights: Privacy policy

Trusted by

Two situations

Community and Enterprise: support ends differently.

What the end of support means depends on your edition. In both cases it is worth planning the next step before security fixes stop.

  • Community Edition: community support for each version ends when the next one is released.
  • Pimcore 11.5 (version 2024.4): fixes are now available only in the Enterprise Edition, under LTS until December 2026.
  • Version 2025.4 has LTS until December 2028.
  • Version 2025.4 is the last one with the classic admin interface. From version 2026.1 it is gone, and the new Pimcore Studio interface remains.

What we check

Your Pimcore review in 60 minutes.

  • Version and edition

    Which version and edition you run, and until when you get security fixes.

  • Add-ons and custom code

    Bundles and extensions your company has added, and whether they work with the new version.

  • Integrations

    Connections to your ERP, shop and marketplaces that the upgrade has to account for.

  • Options

    Upgrade, Enterprise with LTS, or an audit: we tell you plainly what makes sense in your situation.

How the review works

What happens after your request.

  1. 01

    Request

    You send the form. Within 1 business day we reply with a proposed time.

  2. 02

    Review, 60 minutes

    Together we go through your version, edition, extensions and integrations. The call is held in English. You do not need to prepare anything.

  3. 03

    Findings

    We tell you plainly what the end of support means for your installation and what options you have.

What the client says

The implementation of the Pimcore system was a key step in our development. The goal was to create a central source of data and present our products in an innovative way. We wanted the site to be intuitive and have a unique design. The system allowed us to automate, speed up and improve the quality of communication, which significantly improved our company's image and user experience.

Piotr KrawczykVice Marketing Director · Ceramika Paradyż

Case studies

Pimcore projects for our clients.

A bathroom finished with Ceramika Paradyż tiles, with a dark green marble-effect floor.
PIM, DAM and e-commerce hub

Ceramika Paradyż

A central hub for product data and presentation, built on Pimcore.

Read case study
The GTV warehouse with an automated vertical storage system and high-bay pallet racks.
ETIM / BMEcat mapping

GTV

A central Pimcore system extended with ETIM classification, BMEcat export and the ETIM Mapper tool.

Read case study
A VOX living and dining room with a round table, open shelving and a sideboard in light wood.
PIM and composable commerce

VOX

Pimcore as the foundation for product data management and a composable commerce architecture.

Read case study
FAQ

Questions before the review.

Community Edition: how long do we have support?

Community support for each version ends when the next one is released. Fixes for an older version, for example Pimcore 11.5 (2024.4), are now available only in the Enterprise Edition.

What exactly does LTS cover?

LTS covers security fixes for critical vulnerabilities and fixes for critical bugs in a version that is no longer the latest. Pimcore includes it only in the Enterprise and Enterprise PaaS editions: for Pimcore 11.5 (2024.4) until December 2026, for version 2025.4 until December 2028.

How is the review different from a Pimcore audit?

The review is a free 60‑minute call: version, edition, extensions and options. A full audit usually takes 1 to 2 weeks and ends with a report with priorities. After the review we will tell you whether you need an audit.

Can we do the upgrade ourselves?

You can. The review shows what in your installation needs attention before the upgrade. With us you draw on the experience of a team with 48 Pimcore clients (pimcore.com directory). We are a Pimcore Platinum Partner, one of two in Poland.

Free Pimcore review

Find out what is next for your Pimcore.

Tell us which version and edition you run. We will reply with a time for the 60‑minute review. The call is held in English, and you do not need to prepare anything.

Book a free review

We reply personally within 1 business day.

The data controller is Lemonmind sp. z o.o., Azymutalna 9, 80‑298 Gdańsk. We use the data from this form to reply to your request. Details and your rights: Privacy policy